Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Landfill Scale House (Zemel Road)
Last Updated: 03/15/2024 Category: County Facilities Current Phase: Construction
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Last Updated: 03/15/2024 Current Phase: Planning and Project Approval
Last Updated: 03/14/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
GC Herring Phase II design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.Last Updated: 03/14/2024 Category: Roadway Current Phase: Planning and Project Approval
Flamingo/Edgewater Widening
William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 03/14/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Planning and Project Approval
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Mid-County Library Hurricane Repairs
Last Updated: 03/14/2024 Category: County Facilities Current Phase: Planning and Project Approval
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Fruitland Avenue Avenue of the Americas Sidewalk
Last Updated: 03/13/2024 Category: Sales Tax Funded Category: Sidewalks Current Phase: Construction
Fruitland Avenue Avenue of the Americas SidewalkCaring Way and Brinson Avenue Sidewalks
Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Design Development
Caring Way and Brinson Avenue SidewalksMidway Boulevard Sidewalk (HB41)
Last Updated: 03/13/2024 Category: Sidewalks Current Phase: Planning and Project Approval
Midway Boulevard sidewalk and pedestrian bridge.