Charlotte County, FL Logo

941.743.1200
默多克圆环18500号
Port Charlotte, FL 33948

移动菜单关闭图标
接近搜索

项目状态更新

公共工程 Ian Projects

飓风伊恩项目

Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

G.C. 鲱鱼公园 正规澳门赌博网址大全 Image

G.C. 鲱鱼公园 销售税项目

Last Updated: 04/12/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

GC Herring Phase II design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and 娱乐 master Plan. 

阅读更多

Fire Station 3 Replacement

Fire Station 3 Replacement 销售税项目

Last Updated: 04/12/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.

阅读更多

Bridgeless Barrier Islands Accessibility Study 正规澳门赌博网址大全 Image

Bridgeless Barrier Islands Accessibility Study

Last Updated: 04/12/2024 类别:其它 当前阶段: Planning and Project Approval

This Study is focused on exploring alternative/additional mode(s) of access to/from Charlotte County's bridgeless barrier islands for the transferring of people, 货物, and/or services between the islands and the mainland. These islands include Palm Island, Little Gasparilla Island, 唐佩德罗岛, and Knight Island/Thornton Key. 

阅读更多

Ainger Creek Boat Ramp Replacement 正规澳门赌博网址大全 Image

Ainger Creek Boat Ramp Replacement

Last Updated: 04/12/2024 Category: 公园和娱乐 当前阶段: 设计开发

This project consists of evaluating the site to improve traffic flow and to maximize parking, determining the best location for possible construction of a permanent 厕所 facility, and evaluating the current ramp to minimize buffering time for loading and unloading vessels.

阅读更多

小威廉·R·盖恩斯. Veterans Memorial Park Phase II

小威廉·R·盖恩斯. Veterans Memorial Park Phase II 销售税项目

Last Updated: 04/12/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

威廉R. 盖恩斯小. Veterans Memorial Park phase II design and construction.

阅读更多

Mid-County Library Hurricane Repairs

Mid-County Library Hurricane Repairs

Last Updated: 04/12/2024 Category: 县设施 当前阶段: Planning and Project Approval

Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy. 

阅读更多

Fire Station 6 Replacement

Fire Station 6 Replacement 销售税项目

Last Updated: 04/12/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.

阅读更多

Placida West Boat Ramp Expansion 正规澳门赌博网址大全 Image

Placida West Boat Ramp Expansion 销售税项目

Last Updated: 04/12/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: 设计开发

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak发射, 厕所, 和停车.

阅读更多

Babcock Ranch CCSO District 5 Office 正规澳门赌博网址大全 Image

Babcock Ranch CCSO District 5 Office

Last Updated: 04/10/2024 Category: 县设施 当前阶段: 建设

12个,000 square foot building shell has been completed by Kitson Partners of Babcock Ranch in partnership with Florida Premier Contractors. The interior work is expected to start April 2024.

阅读更多

Delivering Exceptional Service

问题? 问题?

澳门正规网赌网址大全